File #: PC 19-120    Version: 1 Name: Beavercreek Road Preferred Street Cross Section
Type: Planning Item Status: Agenda Ready
File created: 11/4/2019 In control: City Commission Work Session
On agenda: 11/12/2019 Final action:
Title: Beavercreek Road Concept Plan: Beavercreek Road Design
Sponsors: John Lewis, Laura Terway
Attachments: 1. Staff Report, 2. Staff Memo, 3. Roundabout Conceptual Study, 4. Beavercreek Road Design Survey Link, 5. November 4, 2019 ODOT Letter, 6. DKS Associates Analysis (August 6, 2019), 7. DKS Associates Analysis Appendix, 8. DKS Transportation Zone Change Memo (June 21, 2019), 9. Citizen Comment Received
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Title
Beavercreek Road Concept Plan: Beavercreek Road Design

Body
RECOMMENDED ACTION (Motion):
Broad direction on the following items:

How many lanes should Beavercreek Road be within the Concept Plan corridor?
What type of intersections should Beavercreek Road have within the Concept Plan corridor?
Should the City renegotiate with ODOT to revise the Alternate Mobility Standard by removing Holly Lane connection projects from Transportation System Plan (TSP)?
Should Beavercreek Road along the Concept Plan corridor be constructed by developers incrementally with development or as a capital improvement project at once?

BACKGROUND:
The city is currently updating the Comprehensive Plan and Oregon City Municipal Code (OCMC) to allow planned housing and mixed-use development in the Beavercreek Road Concept Plan area. Development of each newly zoned parcel will be based on market conditions, which could take many years to build out fully. Transportation impacts will be addressed at the time of each development application, which requires compliance with the Concept Plan and city development standards. More information can be found at www.orcity.org/Beavercreekroadconceptplan

However, staff and City Commissioners were hearing from the public that 11 years after Concept Plan adoption, a fresh look may be needed to see if the adopted 3-lane design of Beavercreek Road (roughly Old Acres Road to Clairmont Road) reflected the community vision compared to a 5-lane section and the type of intersection control (roundabouts or traffic lights) along the corridor should also be reviewed.

At the August 13, 2019 City Commission work session, the City Commission requested that staff return at a future work session with more detail about the cost and design impacts of roadways width and intersection control for the area of Beavercreek Road that abuts the Beavercreek Road Concept Plan boundary as well as more feedback from the public.

The following memo and attachments wil...

Click here for full text