File #: PC 14-095    Version: 1 Name:
Type: Land Use Item Status: Agenda Ready
File created: 8/18/2014 In control: Planning Commission
On agenda: 8/25/2014 Final action: 8/25/2014
Title: CU 13-03: Conditional Use and SP 13-22 Site Plan and Design Review for a wireless communication pole on the McLoughlin Elementary School property, located at 19230 South End Road.
Sponsors: Tony Konkol
Attachments: 1. Commission Report August 25.pdf, 2. CU 13-03 SP 13-22 staff report REVISED, 3. Public Comments prior to July 14th, 4. All public comments after July 14, 5. Petition, 6. Land Use Application Form, 7. Applicant's Narrative and Review Criteria, 8. Applicant's Site Plan and Drawings, 9. Photoisms, 10. Radio Frequency Engineer Site Analysis, 11. Letter from applicant re: timing, 12. Noise Report, 13. Title Report, 14. Structural Calculations, 15. FAA and ODA compliance, 16. NIER radiation emissions compliance letter, 17. FCC Liciense, 18. Neighborhood Meeting Documentation, 19. Pre-Application Notes, 20. Revised Application Material Cover Letter - submitted August 18, 21. Revised Narrative and Review Criteria - submitted August 18, 22. Revsied Radio Frequency Location Analysis - August 20
Title
CU 13-03: Conditional Use and SP 13-22 Site Plan and Design Review for a wireless communication pole on the McLoughlin Elementary School property,  located at 19230 South End Road.
 
Body
RECOMMENDED ACTION (Motion):
Staff recommends the Planning Commission approve the proposal with the conditions listed in the staff report.
BACKGROUND:
The applicant is requesting approval of a conditional use and site plan and design review permit for the installation of a wireless communication pole on the McLoughlin Elementary school property at 19230 South End Road.  The project includes a 75-foot pole designed to resemble a fir tree and an equipment cabinet on the south/southwest side of the property, adjacent to the parking lot turnaround area.
Attachments 19, 20, and 21 are revisions to the application submitted by the applicant on August 18, 2014.  Additional public comments and a petition have been submitted as well. The staff report has been updated to reflect the additional information and comments.  The staff report changes include the following:
 
1. Most recent public comments have been summarized on Page 10-11
2. Revision to the findings in Chatper 17.41 Tree Protection  and to Condition of Approval #5.
3. Revised applicant name
4. Additional materials submitted are included in the list of Exhibits.