File #: 20-306    Version: 1 Name: Personal Services Agreement Amendment No. 1 with Wallis Engineering for the 2020 Inflow Reduction Project
Type: Contract Status: Consent Agenda
File created: 6/7/2020 In control: City Commission
On agenda: 6/17/2020 Final action:
Title: Personal Services Agreement Amendment No. 1 for Services During Construction with Wallis Engineering for the 2020 Inflow Reduction Project
Sponsors: John Lewis
Attachments: 1. Staff Report, 2. PSA Amendment No.pdf, 3. Exhibit A and Exhibit B - Scope of Work, 4. Construction Plans Cover Sheet, 5. CI 19-017 PS Contract with Wallis
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Personal Services Agreement Amendment No. 1 for Services During Construction with Wallis Engineering for the 2020 Inflow Reduction Project

 

Body

RECOMMENDED ACTION (Motion):

Authorize the City Manager to execute Amendment No. 1 with Wallis Engineering to provide services during construction for the 2020 Inflow Reduction Project (CI 19-017) in the amount of $68,025.34.

 

EXECUTIVE SUMMARY:

Amendment 1 of Personal Services Agreement for Services During Construction with Wallis Engineering for the 2020 Inflow Reduction Project.

 

BACKGROUND:

The City of Oregon City's Sanitary Sewer Master Plan (SSMP) became effective November 1, 2014. During the update of the master plan, the City's consultant, Brown and Caldwell (B&C), evaluated the City’s sanitary sewer system. The City conducted smoke testing in the sanitary sewer system throughout three basins in 2016. Smoke testing is a necessary course of action to improve the sewer collection system by reducing unwanted stormwater inflow and infiltration.

 

Inflow occurs when storm drainage is improperly piped into the sewer. Infiltration occurs when cracks or other defects in the sewer mains allow groundwater to enter. Unwanted storm drainage and groundwater flow into the sewer which increases risk of sewage overflows and unnecessarily increases the volume of wastewater treated at the treatment plant, ultimately increasing ratepayer costs. Based on the smoke testing, seven sources of inflow have been identified commonly from stormwater catch basins. A capital improvement project will need to be carried out to address the problem. The project consists of disconnecting known sources of stormwater inflow from the sanitary sewer system, along with the improvements necessary to remove these sources.

 

Wallis Engineering was chosen for design services to disconnect the inflow sources and properly connect them to the storm system. The services include surveying, field explorations of site conditions, evaluation of alternative construction methods, and final design for construction bidding.

 

PSA Amendment #1

Amendment 1 includes project services during construction for the project. Services include construction management and inspection support to City staff through the completion of the project. Because of the additional scope of work, the contract is being increased by $68,025.34, taking the total not to exceed amount of this contract to $190,129.06. These funds will come from funds budgeted in the sewer fund.

 

OPTIONS:

1.                     Approve this contract amendment.

2.                     Disapprove this contract amendment.

 

BUDGET IMPACT:

Amount:                     $68,025.34

FY(s):                     2019/29 & 2020/2021

Funding Source:                     Sewer Fund